Logo del repository
  1. Home
 
Opzioni

Analysis and Installation of a New Line for Assembling Heat Exchangers

De Franceschi, Alvaro
•
Facchin, Andrea
•
PADOANO, Elio
•
POZZETTO, DARIO
2015
  • conference object

Abstract
The study concerns the implementation of Lean Manufacturing in a company that manufactures heat exchangers in order to improve the performance of an assembly line. After analyzing the value stream in the current situation, changes were made to the layout and the operations, aiming to eliminate activities that do not add value for the customer, reduce lead times and increase the speed and flexibility to changes in demand in terms of volumes and product mix. Changes to the system were introduced in a model to simulate both the present situation (“as-is”) and the future situation of the value stream (analysis "to-be") and to identify the configuration of a new assembly line that allows for the improvement of material handling and reduction of lead time. A new layout was developed, and a supermarket was introduced to feed materials to assembling operations.
Archivio
http://hdl.handle.net/11368/2846538
Diritti
closed access
license:digital rights management non definito
FVG url
https://arts.units.it/request-item?handle=11368/2846538
Soggetti
  • assembly line

  • lean manufacturing

  • simulation

google-scholar
Get Involved!
  • Source Code
  • Documentation
  • Slack Channel
Make it your own

DSpace-CRIS can be extensively configured to meet your needs. Decide which information need to be collected and available with fine-grained security. Start updating the theme to match your nstitution's web identity.

Need professional help?

The original creators of DSpace-CRIS at 4Science can take your project to the next level, get in touch!

Realizzato con Software DSpace-CRIS - Estensione mantenuta e ottimizzata da 4Science

  • Impostazioni dei cookie
  • Informativa sulla privacy
  • Accordo con l'utente finale
  • Invia il tuo Feedback