Logo del repository
  1. Home
 
Opzioni

First measurements of beam backgrounds at SuperKEKB

Lewis, P. M.
•
Jaegle, I.
•
Nakayama, H.
altro
Yokoyama, S.
2019
  • journal article

Periodico
NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH. SECTION A, ACCELERATORS, SPECTROMETERS, DETECTORS AND ASSOCIATED EQUIPMENT
Abstract
The high design luminosity of the SuperKEKB electron–positron collider is expected to result in challenging levels of beam-induced backgrounds in the interaction region. Properly simulating and mitigating these backgrounds is critical to the success of the Belle II experiment. We report on measurements performed with a suite of dedicated beam background detectors, collectively known as BEAST II, during the so-called Phase 1 commissioning run of SuperKEKB in 2016, which involved operation of both the high energy ring (HER) of 7 GeV electrons as well as the low energy ring (LER) of 4 GeV positrons. We describe the BEAST II detector systems, the simulation of beam backgrounds, and the measurements performed. The measurements include standard ones of dose rates versus accelerator conditions, and more novel investigations, such as bunch-by-bunch measurements of injection backgrounds and measurements sensitive to the energy spectrum and angular distribution of fast neutrons. We observe beam–gas, Touschek, beam–dust, and injection backgrounds. As there is no final focus of the beams in Phase 1, we do not observe significant synchrotron radiation, as expected. Measured LER beam–gas backgrounds and Touschek backgrounds in both rings are slightly elevated, on average three times larger than the levels predicted by simulation. HER beam–gas backgrounds are on average two orders of magnitude larger than predicted. Systematic uncertainties and channel-to-channel variations are large, so that these excesses constitute only 1–2 sigma level effects. Neutron background rates are higher than predicted and should be studied further. We will measure the remaining beam background processes, due to colliding beams, in the imminent commissioning Phase 2. These backgrounds are expected to be the most critical for Belle II, to the point of necessitating replacement of detector components during the Phase 3 (full-luminosity) operation of SuperKEB.
DOI
10.1016/j.nima.2018.05.071
WOS
WOS:000450881000011
Archivio
http://hdl.handle.net/11368/2941980
info:eu-repo/semantics/altIdentifier/scopus/2-s2.0-85053324797
http://www.sciencedirect.com/science/journal/01689002
Diritti
closed access
license:copyright editore
FVG url
https://arts.units.it/request-item?handle=11368/2941980
Soggetti
  • Accelerator

  • Beam background

  • Beam–ga

  • Electron–positron col...

  • Touschek

  • Nuclear and High Ener...

  • Instrumentation

Scopus© citazioni
32
Data di acquisizione
Jun 14, 2022
Vedi dettagli
Web of Science© citazioni
34
Data di acquisizione
Mar 20, 2024
google-scholar
Get Involved!
  • Source Code
  • Documentation
  • Slack Channel
Make it your own

DSpace-CRIS can be extensively configured to meet your needs. Decide which information need to be collected and available with fine-grained security. Start updating the theme to match your nstitution's web identity.

Need professional help?

The original creators of DSpace-CRIS at 4Science can take your project to the next level, get in touch!

Realizzato con Software DSpace-CRIS - Estensione mantenuta e ottimizzata da 4Science

  • Impostazioni dei cookie
  • Informativa sulla privacy
  • Accordo con l'utente finale
  • Invia il tuo Feedback